> ## Documentation Index
> Fetch the complete documentation index at: https://docs.kodelabs.com/llms.txt
> Use this file to discover all available pages before exploring further.

# Schedule fields and options

> Reference for AssetOps schedule list columns, filter criteria, creation wizard fields, and bulk edit fields

Look up the values that define a schedule in AssetOps. To create or manage schedules, see [Building schedules](https://docs.kodelabs.com/products/assetops/schedules/schedules-overview.md).

## List columns

These columns appear on the building and [portfolio](https://docs.kodelabs.com/products/assetops/portfolio/schedules.md) schedule lists.

| Column | Description |
| - | - |
| **Title** | Schedule name as a link, with schedule ID below (for example, `SCH-02235`). An external-link icon opens the linked Cloud BMS device when applicable. |
| **Work type** | **Preventive maintenance** or **Inspection** |
| **Recurrence** | How often work is generated (for example, **Weekly**, **On demand**) |
| **Status** | **Active** or inactive |
| **Tasks** | Number of tasks and total estimated time |

## Filter criteria

These criteria are available in the **Filters** panel on the schedule list.

| Filter | Description |
| - | - |
| **Next run date** | Date range for upcoming runs |
| **Work type** | Preventive maintenance or Inspection |
| **Inspection type** | Inspection category for inspection schedules |
| **Assignee** | User assigned to generated work orders |
| **Team assigned** | Team assigned to generated work orders |
| **Frequency** | Recurrence pattern (for example, monthly, weekly) |
| **Asset** | Asset included on the schedule |
| **Asset type** | Type of asset included on the schedule |

## Work types

| Work type | Description |
| - | - |
| **Preventive maintenance** | Recurring maintenance for building systems and assets |
| **Inspection** | Routine site or asset walkthroughs to log findings |

When you select **Inspection**, choose an inspection type.

| Inspection type | Description |
| - | - |
| **Assets** | Inspect individual assets |
| **Area** | Inspect rooms, floors, or common areas |
| **General** | Catch-all for miscellaneous observations |

## Wizard steps

| Step | Purpose |
| - | - |
| **General info** | Title, asset type, assignment, description, attachments |
| **Schedule** | Timing, recurrence, due dates, and auto-fail |
| **Assets** | Assets included on the schedule |
| **Tasks** | Task templates or task groups for generated work orders |
| **Overview** | Review settings before you create the schedule |

## General info fields

**Title** `Field` *required*

Name for the schedule.

**Asset type** `Dropdown` *required*

Asset types this schedule applies to.

**Assignee** `Dropdown`

User assigned to work orders the schedule generates.

**Assign team** `Dropdown`

Team assigned to work orders the schedule generates. Work orders assign to the entire team so members can assign work to themselves.

**Description** `Field`

Notes about the schedule scope or procedure.

**Attachments** `Field`

Files such as procedures or reference images. Select the upload area to add attachments.

## Timing and recurrence fields

**Schedule type** `Dropdown` *required*

**Just once**, **Recurrent**, or **On demand**. The fields below change based on your selection.

**Start date and time** `Date` *required*

When the schedule begins generating work. Enter a date between 1970 and 2099. The form checks the date as you enter it.

**End date and time** `Date`

Optional end date for the schedule window.

**Due by days** `Field` *required*

Number of days the assignee has to complete work after it is scheduled.

**Frequency** `Dropdown` *required*

Recurrence interval for recurrent schedules (for example, **Weekly**). Some frequencies support custom repeat options.

For custom recurrence, set **Repeat on** (days of the week) and **On months** when those controls appear.

## Auto-fail fields

**Auto-fail** `Toggle`

When enabled, work orders auto-fail if not completed by the configured threshold.

**Days after due date** `Field` *required*

Days after the due date before auto-fail applies (shown when **Auto-fail** is on).

## Asset addition methods

| Method | Description |
| - | - |
| **Add by asset type(s)** (recommended) | Includes all assets of the selected types. New assets of those types added later are included automatically. |
| **Add by asset list** | Select specific assets from a searchable table. |

## Bulk edit fields

Bulk edit updates only the fields you enable. Values apply to every selected schedule.

**Assignee** `Dropdown`

User assigned to work orders the selected schedules generate.

**Team assigned** `Dropdown`

Team assigned to work orders the selected schedules generate.

**Auto-fail** `Dropdown`

Auto-fail behavior for work orders created by the selected schedules.

**Activation mode** `Dropdown`

Activate or deactivate the selected schedules.

**Due-by days** `Field`

Number of days that set when generated work orders are due.

**Next run date** `Date`

Date that triggers the next schedule run.

**Auto-fill** `Toggle`

Force an immediate auto-fill across the selected schedules.

## Detail page tabs

| Tab | Purpose |
| - | - |
| **Details** | General information, description, and timing |
| **Attachments** | Files linked to the schedule |
| **Tasks** | Task templates assigned to generated work orders |
| **Assets** | Building assets included on the schedule |
| **Logs** | History of work order batches the schedule created |

## Detail page fields

**General information** shows these values.

| Field | Description |
| - | - |
| Title | Schedule name |
| Number | Schedule ID (for example, `SCH-00091`) |
| Status | **Active** or inactive |
| Assignee | User assigned to generated work orders |
| Team assigned | Team assigned to generated work orders |
| Created by | User who created the schedule |
| Created at | Creation date |
| Asset type | Asset types on the schedule (for example, **AHU**) |
| Start date and time | When the schedule starts |

**Schedule** shows timing and recurrence.

| Field | Description |
| - | - |
| Next run | Next scheduled run date and time |
| End by | End date for the schedule window |
| Recurrence | Pattern (for example, weekly on Monday) |
| Due by | Days to complete work after it is scheduled |
| On month(s) | Months when recurrent runs apply |
| Auto-fail | Days after due when work auto-fails |

## Related reference

> [card] [Task fields](https://docs.kodelabs.com/products/assetops/reference/task-fields.md)
>
> Template and group fields you assign during schedule setup.

> [card] [Work order fields](https://docs.kodelabs.com/products/assetops/reference/work-order-fields.md)
>
> Fields on the work orders a schedule generates.
