Meters
Link child meters to a parent meter
Makes one or more meters children of a parent meter.
POST
Link child meters to a parent meter
The parent and every child must be meters of the building. The body must hold the same
buildingId as the path. Sending the same link again is not an error. The response is 204 with no body.To list the children of a meter, use the
parentMeterId filter of List meters. To remove a link, use Unlink a child meter.Authorizations
Paste an access token from Create an access token. Tokens expire, so request a new one if you receive 401.
Path Parameters
Building identifier from List buildings.
Body
application/json
Identifier of the building. Use the same building as in the path. Required.
Pattern:
\SIdentifier of the parent meter. Required.
Pattern:
\SIdentifiers of the child meters. At least one. All meters must be in this building. Required.
Minimum array length:
1Response
The meters were linked. The response has no body.

