Points
Update points in a batch
Starts a job that updates up to 1,000 points, each with its own fields.
POST
Update points in a batch
The update runs as a job. The request is checked for shape, a job is created, and the response returns that job. Poll Get a job with the job
_id until status is COMPLETED, FAILED or CANCELED.
Each item has the point id and any of the fields of Update a point. Fields you leave out keep their current value. Send each id once.
The job checks that every point exists in the building. If any
id is unknown or belongs to another building, the job ends with FAILED and no point is changed. After a COMPLETED job, read the points to confirm the new values.Authorizations
Paste an access token from Create an access token. Tokens expire, so request a new one if you receive 401.
Path Parameters
Building identifier from List buildings.
Body
application/json
Required array length:
1 - 1000 elementsResponse
The job was accepted. Its status is PROCESSING.
Date and time in UTC, with a numeric offset and no colon, for example 2026-10-28T13:51:31+0000.
Example:
"2026-10-28T13:51:31+0000"
Date and time in UTC, with a numeric offset and no colon, for example 2026-10-28T13:51:31+0000.
Example:
"2026-10-28T13:51:31+0000"
Available options:
PENDING, PROCESSING, PROCESSED, COMPLETED, FAILED, CANCELED 
